Public Groups Area » Public ProjectView
ProjectView
All Projects
showing 601–700 of 1162 projects | page « 1 2 3 4 5 6 7 8 9 10 11 12 »
Name![]() | State |
---|---|
page=projects&type=projects | |
page=projects&type=project | |
OBF Issue 3580, [Billing, EDI] Create New code in Section 10.4 for Virtual Path Sub-Indicator
| Final Closure |
page=projects&type=project | |
OBF Issue 3581, [Billing, EDI] Create New UOM code in Section 10.4 for Next Gen Unit of Measure “Per 1K Pop”
| Final Closure |
page=projects&type=project | |
OBF Issue 3582, [Billing, EDI] Create New Code in Section 10.4 for Service Sub-Product Category Code
| Final Closure |
page=projects&type=project | |
OBF Issue 3583, [Billing, EDI] Create New OC DE 1000 code values in Section 10.4 for Other Charges and Credits Category
| Final Closure |
page=projects&type=project | |
OBF Issue 3584, LSOG: Update the Number portability Form to include Transfer of Call fields
| Withdrawn |
page=projects&type=project | |
OBF Issue 3585, LSOG: Update End User Form to include Shipping Address Fields
| Final Closure |
page=projects&type=project | |
OBF Issue 3586, LSOG: Allow NID Request (NIDR) Field on Centrex form
| Final Closure |
page=projects&type=project | |
OBF Issue 3587, LSOG: Update the Local Service Request Form (071) to include new field APT CON
| Final Closure |
page=projects&type=project | |
OBF Issue 3588, UOM-ASR: Clarify the Access Providers’ methodology (C/NR) for returning non-fatal ‘soft’ errors within UOM Vol I, II, and III based on earlier UOM updates
| Final Closure |
page=projects&type=project | |
OBF Issue 3589, ASOG: Add new OEC Desired Due Date field to the Multi EC Practice (ATIS-0404018-00XX)
| Final Closure |
page=projects&type=project | |
OBF Issue 3590, ASOG: Add new DIVOPT field to Practice 005, 007, 008, 013, 026 and 027
| Withdrawn |
page=projects&type=project | |
OBF Issue 3591, ASOG: Add new PREV PON field to Practice 001
| Final Closure |
page=projects&type=project | |
OBF Issue 3592, OS: Modification of the Ethernet Ordering Technical Specification based on MEF-defined Ethernet service attributes associated with Access E-Line
| Final Closure |
page=projects&type=project | |
OBF Issue 3593, OS: Create technical implementation specification to support Ethernet ordering of MEF Access E-Line Services
| Tabled |
page=projects&type=project | |
OBF Issue 3594, ASOG: Remove date fields related to confirming DLR reports due to lack of use
| Final Closure |
page=projects&type=project | |
OBF Issue 3595, LSOG: Abbreviated High Speed Internet Form and Practice
| Final Closure |
page=projects&type=project | |
OBF Issue 3596, LSOG: Add new NID Request (NIDR) value to reflect a NID move at the existing location
| Final Closure |
page=projects&type=project | |
OBF Issue 3597, LSOG: Add 2 new values to the AC (Account Structure) Field on LSR
| Withdrawn |
page=projects&type=project | |
OBF Issue 3598, ASOG: SR field modification for new values
| Final Closure |
page=projects&type=project | |
OBF Issue 3599, ASOG: Modification to SUP definition
| Final Closure |
page=projects&type=project | |
OBF Issue 3600, ASOG: Modify LOS Field to expand from 20 to 21 Data Characteristics
| Final Closure |
page=projects&type=project | |
OBF Issue 3601, ASOG: Addition of ICSC to UOM Pre-order Location Address Results
| Final Closure |
page=projects&type=project | |
OBF Issue 3602, ASOG: Provider Test Acceptance Notification
| Final Closure |
page=projects&type=project | |
OBF Issue 3603, ASOG: Add new field TLE to Practice 001
| Final Closure |
page=projects&type=project | |
OBF Issue 3604, ASOG: Field modification based on RTR update within ASOG 56
| Final Closure |
page=projects&type=project | |
OBF Issue 3605, ASOG: SR field modification for new values
| Final Closure |
page=projects&type=project | |
OBF Issue 3606, ASOG: Modify the SALI Form (Practice 015) to add Latitude and Longitude
| Final Closure |
page=projects&type=project | |
OBF Issue 3607, ASOG: Add new valid entry to CNT field to Practice 010
| Final Closure |
page=projects&type=project | |
OBF Issue 3608, National Emergency Procedures for Access Ordering Interfaces
| Final Closure |
page=projects&type=project | |
OBF Issue 3609, ASOG: Modify PTA (020) practice to support new fields (ASR NO, PTA VER, VC NUM…) and clarify existing assumptions
| Final Closure |
page=projects&type=project | |
OBF Issue 3610, ASOG: Update fields on Trunking Form to support minimal disconnect principals
| Final Closure |
page=projects&type=project | |
OBF Issue 3611, ASOG: Modify CSPC Usage to clarify CCS Trunk requests
| Final Closure |
page=projects&type=project | |
OBF Issue 3612, UOM: Modify UOM Vol III to standardize Provider Test Acceptance at the root level
| Final Closure |
page=projects&type=project | |
OBF Issue 3613, ASOG: Modify ASR (001) practice to clarify the valid entry text for value of “T”.
| Final Closure |
page=projects&type=project | |
OBF Issue 3614, UOM: Redraw existing UOM Vol I diagrams in Visio
| Final Closure |
page=projects&type=project | |
OBF Issue 3616, ASOG: GETO field modification for new values
| Final Closure |
page=projects&type=project | |
OBF Issue 3617, ASOG: Addition of LATENCY value for Optical Wave Service
| Final Closure |
page=projects&type=project | |
OBF Issue 3618, UOM: Modify the LAT_LONG attribute conditionality within UOM Vol II and III to be optional
| Final Closure |
page=projects&type=project | |
OBF Issue 3619, ASOG: Modify SALI (015) practice to update existing fields (LAT, LONG) to clarify existing assumptions
| Final Closure |
page=projects&type=project | |
OBF Issue 3620, ASOG: Update CNR (010) practice to modify the existing Usage for the field CNT to clarify existing assumptions
| Final Closure |
page=projects&type=project | |
OBF Issue 3621, LSOG: Convert Forms to Excel
| Final Closure |
page=projects&type=project | |
OBF Issue 3622, LSOG: Revise ZIP fields on the EU and DU Forms
| Final Closure |
page=projects&type=project | |
OBF Issue 3623, ASOG: Modification of LREF field for ‘R’ activity
| Final Closure |
page=projects&type=project | |
OBF Issue 3624, ASOG: Modify Transport (005) practice to clarify existing LATENCY field
| Final Closure |
page=projects&type=project | |
OBF Issue 3625, LSOG: Modify DU form to add addressing fields for UOM consistency
| Final Closure |
page=projects&type=project | |
OBF Issue 3626, ASOG: Expand Use of FDT field to the ASR Form
| Final Closure |
page=projects&type=project | |
OBF Issue 3627, ASO: Update Internal Committee Documentation to reflect OS changes to initial pending issue closure
| Final Closure |
page=projects&type=project | |
OBF Issue 3628, OS: Development of Digital Services Guide
| Final Closure |
page=projects&type=project | |
OBF Issue 3629, ASOG: Modify the MSL Form (Practice 006) to update Note 1 on GBTN to remove the value “X”
| Final Closure |
page=projects&type=project | |
OBF Issue 3630, ASOG: Modify AFG field to generic field of Gov (Government)
| Final Closure |
page=projects&type=project | |
OBF Issue 3631, LSOG: Valid Value Note cleanup for support of Valid Value of N
| Final Closure |
page=projects&type=project | |
OBF Issue 3632, NEPA: Update the National Emergency Procedures for Access Ordering
| Final Closure |
page=projects&type=project | |
OBF Issue 3633, ASOG: Modify the usage rules for the UREF field on the EVC form
| Final Closure |
page=projects&type=project | |
OBF Issue 3634, ASOG: PNUM addition to Confirmation (Practice 11)
| Final Closure |
page=projects&type=project | |
OBF Issue 3635, ASOG: Change Name and Expand Use of TLE / TLR field to the ASR Form
| Final Closure |
page=projects&type=project | |
OBF Issue 3636, ASOG: Amend documentation for Dark Fiber
| Final Closure |
page=projects&type=project | |
OBF Issue 3637, ASOG: Modify Usage note 1 for DIVPON to allow ACT C
| Final Closure |
page=projects&type=project | |
OBF Issue 3638, ASOG: Modification to DIVCKT field on ACI form
| Final Closure |
page=projects&type=project | |
OBF Issue 3639, ASOG: Modify ASR (001) practice to revise RORD field based on changes made in ASOG 60 with Issue 3635
| Final Closure |
page=projects&type=project | |
OBF Issue 3640, UOM-ASR: Modify UOM-ASR Vol II to rectify inconsistent metadata definition
| Final Closure |
page=projects&type=project | |
OBF Issue 3641, ASOG: Update Introductory Verbiage in Sections 1 and 3 of EVC Form to reflect addition of OAM Section
| Final Closure |
page=projects&type=project | |
OBF Issue 3642, ASOG: Update the UREF field (EVC-016) Usage Note2 to clarify Issue 3633 from ASOG 60
| Final Closure |
page=projects&type=project | |
OBF Issue 3643, Update the meet point exchange process defined by Issue 3464, MECOD: Develop a more standardized provider to provider process for the communication of meet point information
| Final Closure |
page=projects&type=project | |
OBF Issue 3644, ASOG: Modify ASR (001) practice to restrict the number of ACI forms which can be associated with a standalone Port ASR
| Withdrawn |
page=projects&type=project | |
OBF Issue 3645, UOM: Remove occurrences of CDLRD, FCDLRD from UOM Vol I and II
| Final Closure |
page=projects&type=project | |
OBF Issue 3646, ASOG: Remove Verizon Specific Fields from ECI Documentation
| Final Closure |
page=projects&type=project | |
OBF Issue 3647, ASOG: Update ASR Prac (001) to Make DSG FAX NO Optional
| Final Closure |
page=projects&type=project | |
OBF Issue 3648, NEPA: Modify the NEPA process to reflect recommended updates due to the ASOG 60 release delay
| Final Closure |
page=projects&type=project | |
OBF Issue 3649, DLR: Expand UNIT field on the DLR form
| Final Closure |
page=projects&type=project | |
OBF Issue 3650, ASOG: Add IMPCON Email
| Final Closure |
page=projects&type=project | |
OBF Issue 3651, ASOG: Update ASR Practice (001) to add a new field for Variable Term Agreement (VTAI) Indicator
| Final Closure |
page=projects&type=project | |
OBF Issue 3652, ASOG: Modify SITE CON (Practice 001) to include ACTL
| Final Closure |
page=projects&type=project | |
OBF Issue 3653, Repurpose RCODE 6B for Fraud Prevention Purposes
| Final Closure |
page=projects&type=project | |
OBF Issue 3654, ASOG: Prohibited Special Characters
| Final Closure |
page=projects&type=project | |
OBF Issue 3655, ASOG: Modify CNT value to acknowledge PRE-FOC Jeopardy
| Final Closure |
page=projects&type=project | |
OBF Issue 3656, ASOG: Add R-Code to identify Permit delays
| Final Closure |
page=projects&type=project | |
OBF Issue 3657, ASOG: Update Note 1 on RCODE to accept entry pre-FOC. Update UOM Volume II Section 7.1 (State and Activity Diagrams) to support pre-FOC jeopardy.
| Final Closure |
page=projects&type=project | |
OBF Issue 3658, ASOG: Site Survey
| Withdrawn |
page=projects&type=project | |
OBF Issue 3659, ASOG: New Valid Entry ‘C’ for NFRT field
| Final Closure |
page=projects&type=project | |
OBF Issue 3660, ASOG: New NG911 field
| Final Closure |
page=projects&type=project | |
OBF Issue 3661, Modify QTY field on Combo Order to allow for 2 EVCs
| Final Closure |
page=projects&type=project | |
OBF Issue 3662, ASOG: New Fields: Site Survey Indicators
| Final Closure |
page=projects&type=project | |
OBF Issue 3663, Moving the EVC QTY Field
| Final Closure |
page=projects&type=project | |
PTSC Issue 0001, Create ATIS-10000678 (T1.678 v2) Lawfully Authorized Electronic Surveillance (LAES) for Voice over Packet Technologies in Wireline Telecommunication Networks, version 2
| Final Closure |
page=projects&type=project | |
PTSC Issue 0002, LAES for Public IP Network Access Services
| Final Closure |
page=projects&type=project | |
PTSC Issue 0003, ATIS-1000025.2008 US Standard for Signaling Security – Security Roadmap
| Final Closure |
page=projects&type=project | |
PTSC Issue 0004, US Standard for Signaling Security – Generic Control and Signaling Plane
| Final Closure |
page=projects&type=project | |
PTSC Issue 0005, US Standard for Signaling Security – SS7/BICC Network and NNI Interconnection Security
| Final Closure |
page=projects&type=project | |
PTSC Issue 0006, US Standard for Security – VoP/Multimedia Control and Signaling
| Final Closure |
page=projects&type=project | |
PTSC Issue 0007, ATIS-1000028.2008 US Standard for Signaling Security – UNI Access and Signaling
| Final Closure |
page=projects&type=project | |
PTSC Issue 0008, Technical Report on Test Framework for IP-IP Network Interconnection
| Final Closure |
page=projects&type=project | |
PTSC Issue 0009, IP Network-to-Network Interface Standard for VoIP
| Final Closure |
page=projects&type=project | |
PTSC Issue 0010, US Standard: Addendum to T1.679, "Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control or ISDN User Part"
| Final Closure |
page=projects&type=project | |
PTSC Issue 0011, Revision of ANSI T1.111-2000 (MTP)
| Final Closure |
page=projects&type=project | |
PTSC Issue 0012, Revision of ANSI T1.112-2000 (SCCP)
| Final Closure |
page=projects&type=project | |
PTSC Issue 0013, Revision of ANSI T1.113-2000 (ISUP)
| Final Closure |
page=projects&type=project | |
PTSC Issue 0014, ATIS-1000033 Operator Services Functionality in the IP Environment
| Final Closure |
page=projects&type=project | |
PTSC Issue 0015, Revision of ANSI Number Portability TRQs Numbered 1 through 4
| Final Closure |
page=projects&type=project | |
PTSC Issue 0016, Technical Report: Support of Emergency Telecommunication Services in IP Networks
| Final Closure |
page=projects&type=project | |
PTSC Issue 0017, Revision of T1.631 SS7 HPC Network Capability
| Final Closure |
showing 601–700 of 1162 projects | page « 1 2 3 4 5 6 7 8 9 10 11 12 »
Copyright © 2023 Alliance for Telecommunications Industry Solutions. All rights reserved.
Kavi®