Public Groups Area » Public ProjectView
ProjectView
All Projects
showing 901–1000 of 1162 projects | page « 1 2 3 4 5 6 7 8 9 10 11 12 »
Name![]() | State |
---|---|
page=projects&type=projects | |
page=projects&type=project | |
STEP Issue 0107, Study of Proposed Operating DC Voltage Levels for Line Powered Equipment
| Final Closure |
page=projects&type=project | |
STEP Issue 0108R1, Wireline Access Asymmetric Broadband Equipment Energy Efficiency Standard
| Final Closure |
page=projects&type=project | |
STEP Issue 0109, Optical Access Network Equipment Energy Efficiency Standard
| Final Closure |
page=projects&type=project | |
STEP Issue 0110, NPP Standards and their Contribution to Sustainability Initiatives
| Final Closure |
page=projects&type=project | |
STEP Issue 0111, Unpackaged Drop Requirements for Network Communications Equipment Utilized in Central Office and Outside Plant Environments
| Final Closure |
page=projects&type=project | |
STEP Issue 0112, DC Power System Architectures for Evolving Networks
| Withdrawn |
page=projects&type=project | |
STEP Issue 0113, Distributed Refrigerant Cooling Infrastructure
| Final Closure |
page=projects&type=project | |
STEP Issue 0114, Updates to ATIS-0600015.2009, February 2009, Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting – General Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0115, Updates to ATIS-0600015.03.2009, July 2009, Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting for Router and Ethernet Switch Products
| Final Closure |
page=projects&type=project | |
STEp Issue 0116, Revision for ATIS‐0600307.2007 Fire Resistance Criteria – Ignitability Requirements for Equipment Assemblies, Ancillary Non‐Metallic Apparatus, and Fire Spread Requirements for Wire and Cable
| Final Closure |
page=projects&type=project | |
STEP Issue 0117, 400v DC-Powered Equipment Used in the Telecommunications Environment
| Withdrawn |
page=projects&type=project | |
STEP Issue 0118, Revision for ATIS-0600328.2007, Protection of Telecommunications Links from Physical Stress and Radiation Effects and Associated Requirements for DC Power Systems (A Baseline Standard)
| Final Closure |
page=projects&type=project | |
STEP Issue 0119, Revision for ATIS-0600333.2007, Grounding and Bonding of Telecommunications Equipment
| Final Closure |
page=projects&type=project | |
STEP Issue 0120, Revision for ATIS-0600010.2007, Temperature, Humidity and Altitude Standards
| Final Closure |
page=projects&type=project | |
STEP Issue 0121, Wireless (Radio Base Station) Equipment Energy Efficiency Standard, Release 2
| Final Closure |
page=projects&type=project | |
STEP Issue 0122, Updates to ATIS-0600015.01.2009, Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting – Server Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0123, New TEER Supplemental Standard Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting for Power Systems, DC/DC Converters
| Final Closure |
page=projects&type=project | |
STEP Issue 0124, New TEER Supplemental Standard Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting for Power Systems, DC/AC Inverters
| Final Closure |
page=projects&type=project | |
STEP Issue 0125, New TEER Supplemental Standard Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting for Power Systems, UPS
| Withdrawn |
page=projects&type=project | |
STEP Issue 0126, ATIS-0600313.2008, Electrical Protection of Telecommunications Central Offices and Similar Type Facilities
| Final Closure |
page=projects&type=project | |
STEP Issue 0127, Small Networking Devices Efficiency Standard
| Final Closure |
page=projects&type=project | |
STEP Issue 0128, Revision of ATIS-0600010.01.2008, Temperature, Humidity, and Altitude Requirements for Network Telecommunications Equipment Utilized in Outside Plant Environments
| Final Closure |
page=projects&type=project | |
STEP Issue 0129, Revision of ATIS-0600319.2008, Equipment Assemblies - Fire Propagation Risk Assessment Criteria
| Final Closure |
page=projects&type=project | |
STEP Issue 0130, Guidelines for Copper Theft Deterrents in the Telecom Industry
| Final Closure |
page=projects&type=project | |
STEP Issue 0131, 400v DC-Powered Equipment Used in the Telecommunications Environment
| Final Closure |
page=projects&type=project | |
STEP Issue 0132, Revision of ATIS‐0600019.2009, Test Requirements for Pb‐Free Subassembly Modules
| Final Closure |
page=projects&type=project | |
STEP Issue 0133, Revision of ATIS-0600020 and 0600020a, Test Requirements for Pb-Free Circuit Packs
| Final Closure |
page=projects&type=project | |
STEP Issue 0134, Revision of ATIS‐0600336.2009, Engineering Requirements for a Universal Telecom Framework
| Final Closure |
page=projects&type=project | |
STEP Issue 0135, Reference Guideline for Environmental Testing of Communications Equipment
| Final Closure |
page=projects&type=project | |
STEP Issue 0136, Revision to ATIS‐0600320.2010
| Final Closure |
page=projects&type=project | |
STEP Issue 0137, Revision ATIS‐0600331.2010
| Final Closure |
page=projects&type=project | |
STEP Issue 0138, Revision ATIS‐0600338.2010
| Final Closure |
page=projects&type=project | |
STEP Issue 0139, Electrical Coordination of Primary and Secondary Surge Protection for Use in Broadband Applications
| Final Closure |
page=projects&type=project | |
STEP Issue 0140, Energy Efficiency Measurement and Metrics for 802.11xx Access Points
| Final Closure |
page=projects&type=project | |
STEP Issue 0141, UPS TEER Ratings
| Final Closure |
page=projects&type=project | |
STEP Issue 0142, Electrical Protection Considerations for G.fast Deployment
| Letter Ballot |
page=projects&type=project | |
STEP Issue 0143, Revision of ATIS‐0600318.2010, Electrical Protection Applied to Telecommunications Network Plant at Entrances to Customer Structures or Buildings
| Final Closure |
page=projects&type=project | |
STEP Issue 0144, Revision of ATIS-0600337.2010, Requirements for Maximum Voltage, Current, and Power Levels in Network‐Powered Transport Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0145, Update ATIS-060004.2006 [2011], Equipment Surface Temperature
| Final Closure |
page=projects&type=project | |
STEP Issue 0146, Baseline Central Office Power Routine Minimum Tasks and Frequencies
| Final Closure |
page=projects&type=project | |
STEP Issue 0147, Wireless (Radio Base Station) Equipment Energy Efficiency Standard, Release 3
| Final Closure |
page=projects&type=project | |
STEP Issue 0148, Revision of ATIS‐0600332.2010, Electrical Protection of Network-Powered Broadband Facilities
| Final Closure |
page=projects&type=project | |
STEP Issue 0149, 5-Year Revision of ATIS-0600015.04.2010
| Final Closure |
page=projects&type=project | |
STEP Issue 0150, Revision of ATIS-0600005.2006, Acoustic Measurement
| Final Closure |
page=projects&type=project | |
STEP Issue 0151, Optional Method for Testing Routers or Switches with Very High Speed Ports- 40 Gb/s and Higher
| Final Closure |
page=projects&type=project | |
STEP Issue 0152, Revision of ATIS-06000010.01.2014, Temperature, Humidity, and Altitude Requirements for Network Telecommunications Equipment Utilized in Outside Plant Environments
| Final Closure |
page=projects&type=project | |
STEP Issue 0153, Guidance for Fuel Cells as Backup Generators
| Withdrawn |
page=projects&type=project | |
STEP Issue 0154, Revision of ATIS-0600012, Electrical Protection Considerations for Broadband Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0155, Revision of ATIS-0600003.2007(2012), Battery Enclosure and Rooms/Areas
| Final Closure |
page=projects&type=project | |
STEP Issue 0156, Revision of ATIS-0600036, Electrical Protection for Ethernet Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0157, Electrical Protection (including Lightning, Power Fault, and Grounding) for Reverse Powering from Customer Premises
| Withdrawn |
page=projects&type=project | |
STEP Issue 0158, Revision of ATIS-0600015.2013, Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting – General Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0159, Revision of ATIS-0600015.07.2013, Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting – Wireline Access, Asymmetric Broadband Equipment
| Final Closure |
page=projects&type=project | |
STEP Issue 0160, Estimate for Energy Efficiency of Networks/Solutions
| Withdrawn |
page=projects&type=project | |
STEP Issue 0161, Revision of ATIS-0600313.2013, Electrical Protection for Telecommunications Central Offices and Similar Type Facilities
| Final Closure |
page=projects&type=project | |
STEP Issue 0162, Revision of ATIS-0600316.2013, Electrical Protection of Telecommunications Outside Plant
| Final Closure |
page=projects&type=project | |
STEP Issue 0163, Revision of ATIS-0600333.2013, Grounding and Bonding of Telecommunication Equipment
| Final Closure |
page=projects&type=project | |
STEP Issue 0164, Revision of ATIS-0600334.2013, Electrical Protection of Communications Towers and Associated Structures
| Final Closure |
page=projects&type=project | |
STEP Issue 0165, Revision of ATIS-0600308.2008(R2013), Central Office Equipment - Electrostatic Discharge Immunity Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0166, Revision of ATIS-0600016.2008, Remote End POTS Splitter Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0167, Review of ATIS-0600328.2012, Protection of Telecommunications Links from Physical Stress and Radiation effects and Associated Requirements for DC Power Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0168, Refrigerants Update in ATIS-0600031.2014
| Final Closure |
page=projects&type=project | |
STEP Issue 0169, Review of ATIS-0600307.2014, Fire Resistance Criteria – Ignitability Requirements for Equipment Assemblies, Ancillary Non-Metallic Apparatus, and Fire Spread Requirements for Wire and Cable
| Final Closure |
page=projects&type=project | |
STEP Issue 0170, Revision of ATIS-0600029.2013, Standard for Irreversible Compression Lugs, Inline Splices, and Taps
| Final Closure |
page=projects&type=project | |
STEP Issue 0171, Revision of ATIS-0600315.2013, Voltage Levels for DC-Powered Equipment Used in the Telecommunications Environment
| Final Closure |
page=projects&type=project | |
STEP Issue 0172, Revision of ATIS-0600330.2013, Valve-Regulated Lead-Acid Batteries Used in the Telecommunications Environment
| Final Closure |
page=projects&type=project | |
STEP Issue 0173, Review of ATIS-0600319.2014, Equipment Assemblies – Fire Propagation Risk Assessment Criteria
| Final Closure |
page=projects&type=project | |
STEP Issue 0174, Electrical Protection for Ethernet Radio Deployment
| Final Closure |
page=projects&type=project | |
STEP Issue 0175, Intrusion of Outside Plant Cabinets (OSP) to include Insect, Water, and Dust
| Final Closure |
page=projects&type=project | |
STEP Issue 0176, Translation Table of Safety Related Voltages and Currents
| Final Closure |
page=projects&type=project | |
STEP Issue 0177, Revision of ATIS-0600337.2016, Requirements for Maximum Voltage, Current, and Power Levels Used in Communications Transport Circuits
| Final Closure |
page=projects&type=project | |
STEP Issue 0178, Revision of ATIS-0600017.2014, Non-Halogenated DC Power Wire and Cable For Telecommunications Power Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0179, Revision of ATIS-0600001 Electrical Protection Standards and Reference Documents Associated with Telecommunication Networks
| Final Closure |
page=projects&type=project | |
STEP Issue 0180, Revision of ATIS-0600012.06 Electrical Protection for Ethernet Radio Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0181, Temperature, Humidity, and Altitude Requirements for Network Telecommunications Equipment Utilized in Controlled Environmental Spaces
| Final Closure |
page=projects&type=project | |
STEP Issue 0182, Temperature, Humidity, Altitude, and Salt Fog Requirements for Network Telecommunications Equipment Utilized in Outside Plant Environments
| Final Closure |
page=projects&type=project | |
STEP Issue 0183, Revision of ATIS-0600320.2015, Above-Baseline Electrical Protection for Designated Telecommunications Central Offices and Similar-Type Facilities against High Altitude Electromagnetic (HEMP)
| Final Closure |
page=projects&type=project | |
STEP Issue 0184, Revision of ATIS-0600321.2015, Electrical Protection for Network Operator-Type Equipment Positions
| Final Closure |
page=projects&type=project | |
STEP Issue 0185, Revision of ATIS-0600331.2015, Description of Above-Baseline Physical Threats to Telecommunication Links
| Final Closure |
page=projects&type=project | |
STEP Issue 0186, Revision of ATIS-0600332.2015, Electrical Protection of Network-Powered Broadband Facilities
| Final Closure |
page=projects&type=project | |
STEP Issue 0187, Brushfire
| Final Closure |
page=projects&type=project | |
STEP Issue 0188, Water-Based Close-Coupled Cooling and Direct Contact Cooling
| Final Closure |
page=projects&type=project | |
STEP Issue 0189, Specialized Distributed Power Systems
| Final Closure |
page=projects&type=project | |
STEP Issue 0190, Revision of ATIS-0600015.01.2014 Energy Efficiency for Telecommunication Equipment: Methodology for Measurement & Reporting - Server Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0191, Review of Battery plant questions and ATIS 0600315, Voltage Levels for DC-Powered Equipment Used in the Telecommunications Environment
| Final Closure |
page=projects&type=project | |
STEP Issue 0192, Security Requirements for Communications Equipment Sites and Structures
| Final Closure |
page=projects&type=project | |
STEP Issue 0193, Revision of ATIS-0600336.2015, Design Requirements for Universal Cabinets and Framework
| Final Closure |
page=projects&type=project | |
STEP Issue 0194, Creation of ATIS-0600012.07, Electrical Protection for Systems Utilizing Reverse Powering
| Active |
page=projects&type=project | |
STEP Issue 0195, Revision of ATIS-0600012.06 Electrical Protection for Ethernet Radio Systems
| Active |
page=projects&type=project | |
STEP Issue 0196, Revision of ATIS-0600028.2016, DC Power Wire and Cable for Telecommunications Power Systems – for XHHW and DLO/Halogenated RHH-RHW Cable Types
| Final Closure |
page=projects&type=project | |
STEP Issue 0197, Revision of ATIS-0600030.2016, Line Powering of Telecommunications Equipment on Outside Plant (OSP) Twisted Copper Pair Loops
| Final Closure |
page=projects&type=project | |
STEP Issue 0198, Revision of ATIS-0600015.10.2015, Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting DC Power Plant – Inverter Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0199, Revision of ATIS-0600318.2016, Electrical Protection Applied to Telecommunications Network Plant at Entrances to Customer Structures or Buildings
| Final Closure |
page=projects&type=project | |
STEP Issue 0200, Revision of ATIS-0600338.2016, Electrical Coordination of Primary and Secondary Surge Protective Devices for Use in Telecommunications Circuits
| Final Closure |
page=projects&type=project | |
STEP Issue 0201, Fault Managed Power Distribution Technologies testing for barrier compromise detection functions
| Active |
page=projects&type=project | |
STEP Issue 0202, Fault Managed Power Distribution Technologies – Human Contact Fault Analysis
| Active |
page=projects&type=project | |
STEP Issue 0203, Review of ATIS‐0600005.2017, Acoustic Measurement
| Final Closure |
page=projects&type=project | |
STEP Issue 0204, Review of ATIS-0600063, Guidelines for Environmental Testing and Evaluation of Communication Equipment to determine if any updates need to be made to the roadmap
| Letter Ballot |
page=projects&type=project | |
STEP Issue 0205, Revision of ATIS-0600015.04.2017, Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting DC Power Plant – Rectifier Requirements
| Final Closure |
page=projects&type=project | |
STEP Issue 0206, Revision of ATIS 0600015.03.2016 (R2021), Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting for Router and Ethernet Switch Products
| Final Closure |
showing 901–1000 of 1162 projects | page « 1 2 3 4 5 6 7 8 9 10 11 12 »
Copyright © 2023 Alliance for Telecommunications Industry Solutions. All rights reserved.
Kavi®